
- Aug 2025 — Present
Graduate Engineer Trainee
Current- OngoingJul 2025 — Ongoing
KTO — Parts Optimization Platform
- Built a parts optimization platform designed for rollout across multiple manufacturing facilities.
- Developed clustering algorithms for duplicate detection and tolerance-based grouping to surface reusable components.
- Implemented BoM analysis with an interactive factory layout visualization using Konva.
- Cut client-side computation time by ~70% using Web Workers; rendered large datasets efficiently with TanStack Table virtualization.
- Designed multi-tenant role-based access control for isolated factory environments.
Stack
- Next.js
- TanStack Table
- PostgreSQL
- IndexedDB
- Drizzle
- Konva
- Web Workers
- Azure
- Kubernetes
- Mar 2025 — Jul 2025
Software Engineering Intern
- CompletedMar 2025 — Dec 2025
SQD — Supplier Quality Data Platform
- Built supplier-facing workflows for structured collection of material and quality attributes.
- Implemented form validation and data ingestion pipelines connecting to Python backend services.
- Containerized services and supported Azure deployments.
Stack
- Angular
- Python
- SQL Server
- Docker
- Azure










